Don, K4ZA on the 10-stack removing the damaged 8 ele OWA at 105' while John, W2GD, readies the 7ele OWA at 185...

Don, K4ZA, on the 10-stack removing the damaged 8 ele OWA at 105' while John, W2GD, readies the 7ele OWA at 185' for lowering, repair, and reinstallation atop the 15 stack. The small crane was sent to service the large crane so we pressed both into simultaneous service. Note John standing atop the 15 stack.

Comments

Add a comment

No comments yet. Be the first to comment!

  •  

Photo info