|
WØAIH's Gin Pole made out of Rohn 25 is on the way up.
Date: 10/20/2005
Views: 2913
|
Paul WØAIH on the Gin Pole. (pic courtesy WA9HCZ)
Date: 10/22/2005
Views: 2486
|
TOWER: Paul WØAIH on the Gin Pole with Chris KC9DGP below. GROUND: (l-r) Scott KA9FOX and Eric KB9TKF prepare 2m antenna for fin
Date: 10/23/2005
Views: 2199
|
|
Paul WØAIH on the Gin Pole with Chris KC9DGP below.
Date: 10/20/2005
Views: 1984
|
Chris KC9DGP wondering what the record is for pole sitting.
Date: 10/20/2005
Views: 2596
|
Chris KC9DGP Pole Sitting again
Date: 10/20/2005
Views: 2132
|
|
22.5 Foot Chrome Moly Mast from Array Solutions... Going UP!
Date: 10/20/2005
Views: 1991
|
WØAIH and KC9DGP awaiting the arrival of the mast.
Date: 10/20/2005
Views: 1769
|
Ground Crew (L-R) Bill KE9XQ, Mark N9UNW and Jerome WA9HCZ. Note the WØAIH 220v electric winch attached to truck tow
Date: 10/20/2005
Views: 1879
|
|
Eric KB9TKF on Ground Crew duty.
Date: 10/20/2005
Views: 1713
|
Paul WØAIH and Chris KC9DGP inserting mast into rotor plate and bearing.
Date: 10/20/2005
Views: 1985
|
Paul WØAIH and Chris KC9DGP inserting mast into rotor plate and bearing.
Date: 10/20/2005
Views: 1765
|
|
Home of KA9FOX in background. Eric KB9TKF manning the ropes. Note how the wind is blowing the rope -- it got VERY windy in the
Date: 10/20/2005
Views: 1908
|
An extra rotor plate was installed to help keep mast centered during any future maintenance. An old TB3 bearing was put on but s
Date: 10/20/2005
Views: 1821
|
(L-R) Paul WØAIH and Chris KC9DGP working on tower. Note guy wires are Polygon Fiberglass Rod. Also note rope going
Date: 10/20/2005
Views: 2003
|
|
Paul WØAIH on the "Rohn 25 Gin Pole"
Date: 10/20/2005
Views: 1922
|
(L-R) Bill KE9XQ, Jerome WA9HCZ, Mark N9UNW and Eric KB9TKF watch as Paul WØAIH attaches rope to Cushcraft 6 element
Date: 10/20/2005
Views: 1795
|
Mastic and Scotch Super 33 will attempt to keep the water out of the 6 meter beam feedpoint.
Date: 10/20/2005
Views: 1902
|
|
(L-R) Bill KE9XQ, Scott KA9FOX, Eric KB9TKF and Paul WØAIH as the 6m beam is about to be pulled up the tram line. (pi
Date: 10/23/2005
Views: 1850
|
(L-R) Ground Crew: Bill KE9XQ, Jerome WA9HCZ, Mark N9UNW and Eric KB9TKF
Date: 10/20/2005
Views: 1731
|
6 meter beam is about to go up.
Date: 10/20/2005
Views: 1649
|
|
6 Meter beam has been attached to Tramline and is on the way up!
Date: 10/20/2005
Views: 1785
|
There goes the 6 meter beam up the Tram line.
Date: 10/20/2005
Views: 1870
|
(L-R) Bill KE9XQ and Mark N9UNW assist as the 6m beam is pulled up the tram line. (pic courtesy WA9HCZ)
Date: 10/23/2005
Views: 1605
|
|
Paul WØAIH climbs tower after 6m beam was pulled to the top. (Photo by WA9HCZ)
Date: 10/23/2005
Views: 1704
|
Eric KB9TKF, Bill KE9XQ, Scott KA9FOX and Paul WØAIH prepare to raise F12 80m dipole for testing. Note temporary mast installed
Date: 10/23/2005
Views: 1846
|
Inside shot of the Force 12 80 meter CW/SSB Relay box before it goes up the tower.
Date: 10/20/2005
Views: 2280
|
|
Another shot of the 80m CW/SSB relay box. Also shows hairpin helical match and Force 12 1:1 bead balun.
Date: 10/20/2005
Views: 2112
|
Force 12 EF-180C 80m Rotatable Dipole is on the Tram line and on the way up!
Date: 10/20/2005
Views: 2493
|
Chris KC9DGP just can't get enough of that pole sitting. Especially when the winds gust to 30 mph.
Date: 10/20/2005
Views: 2342
|